I've put the red dress on hold for now and have been finishing up other projects that have been lying around.
This first is a sweater I crocheted for Meg. It's kind of got a crocheted-afghan vibe, no doubt due to the use of the classic afghan double crochet stitch. I made it in four pieces, front, back, and sleeves, and then whipstitched it together, single-crocheted around the neckline, and embroidered a mouse. Done.
The second project was a full purple skirt for myself. I made it last winter, but it was too big and I didn't like it, so I partly disassembled it and left it in pieces in my mending pile.
It's a simple dirndl pattern, with pockets and belt loops, and I was able to just rip out the zipper and entire back seam, fold back the excess skirt and waistband on both sides so it was more my size, stitch it up, and re-insert the zipper. It was a little awkward because part of what got folded back was, in fact, gathered fabric, but I decided I didn't care. I hemstitched the loose flaps down and reattached the belt loops. Done.
It feels good to have those finished.
Wednesday, August 08, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment